Friday, April 9, 2010

JBI, Inc. CEO discusses P2O permits

John Bordynuik, CEO of JBI comments on Facebook:

"Will permits and licences be ready to go when P2O is?" For the state of NY" YES. For other states we will seek the assistance of URS. Our FL P2O management team has used URS many times in the past for permitting for their projects. "If they are not will this be a major road block for P2O roll out?" I don't see it as a major road block. We have 5 things going for us: 1) The process does not pollute. 2) We are not handling hazardous waste material (medical waste is a different category) 3) Our residue can go in landfill 4) Our system is close-looped (as you will see at the AGM) so we have no waste water and 5) our emissions do not pollute*** "Is each State different?" Yes. That is the reason for URS. "With proper filtering in place will permits even be necessary?" I believe what will shock the hell out of you at the AGM is that our 20 ton processor does NOT have or require a scrubber on its stack smile No filters. I do want to point out this is for processing unwashed non-hazardous mixed plastic waste. We have 5 beneficial factors that reduce the complexity of permits. It also important to note that our system design is highly simplified which makes documentation, operations, and permitting detail simpler. Medical waste is a totally different situation and we would need filters.

No comments:

Post a Comment

Please comment on this post.

Note: Only a member of this blog may post a comment.